<sup id="eeeee"></sup>
  • <nav id="eeeee"><sup id="eeeee"></sup></nav>
    
    
    <tr id="eeeee"><blockquote id="eeeee"></blockquote></tr>
  • <noscript id="eeeee"><dd id="eeeee"></dd></noscript>
    <tr id="eeeee"><blockquote id="eeeee"></blockquote></tr>
  • <tfoot id="eeeee"><noscript id="eeeee"></noscript></tfoot>
    无码AV免费毛片一区二区,www.色网,99久久精品国产精品亚洲,狠狠色丁香婷婷久久综合2021,免费人成在线观看VR网站,一区二区视频午夜福利,五月天乱伦小说,999久久精品国产

    How to use electric sintering furnace correctly?

    2021-11-29 1597

      1: Check whether the circuit and water circuit of sintering furnace are normal, such as normal power on and water supply.

      2: Open the mechanical pump, slowly open the pre pumping valve after 30 seconds, and open the front stage valve after 1 minute.

      3: When the vacuum degree reaches below 10Pa, turn over the lax pump and heat the lax pump

      4: After the lax pump is heated to 60 minutes, close the pre pumping valve and open the high vacuum valve, and the vacuum will gradually reach the high vacuum.

      5: For heating initiation, please select Manual heating below 200 degrees. In the manual operation menu of the control panel, pay attention to that when you use it once, the dial button is not firm up and down once, and then dial it to the manual position to initiate heating. Enter about 50. Automatic heating when the current is normally controlled below 300A: set the temperature control meter in the temperature control interface to automatically start heating or open the manual position to start heating manually. The above setting clarifies that it takes 120 minutes from 200 degrees to 600 degrees, 30 minutes from 600 degrees, 130 minutes from 600 degrees to 1000 degrees, 5 hours at 1000 degrees, 60 minutes from 1000 degrees to 600 degrees, and the program will continue automatically after 60 minutes (Note: Set - 121 in time, and the program will continue automatically here). After setting the heating process, first heat continuously manually, then turn the dial button to the automatic position to initiate the automatic heating program. If the data needs to be recorded, please mark "√" at the data storage meeting.

      6: In the heat preservation state, the normal circulation of circulating water shall be adhered to.

      7: When the holding time is up, turn off the heating switch. Assuming that high vacuum is not required, close the slack pump, open the pre pumping valve, close the high vacuum valve and start cooling. Caution: do not turn off the mechanical pump

      8: When the temperature drops to 200 ℃, turn off the mechanical pump (the lax pump reaches the normal temperature) and close all valves.

      9: Release the pressure at room temperature, rush in the air and take out the raw materials.

      10: If the operation is not continued, open the mechanical pump and pre pumping valve, vacuum for another 5 minutes, and close the mechanical pump and pre pumping valve. Adhere to the vacuum degree in the operation room to avoid water vapor intrusion.

      11. Pressure operation: first, in the manual operation interface, the pressure reporting form is set to the automatic position, which can be operated directly with the instrument. After setting the program, press the run key for 3 seconds, and press the stop key for 3 seconds.

      Article from:http://m.oavoav.cn

    主站蜘蛛池模板: 成人黄色一级片一级片| 亚洲中文字幕一区二区| 国内精品日本久久久久影院| 特级毛片a级毛片在线播放www| 国产一级一片内射视频| 成人免费看黄网站yyy456| 国产成人AV在线播放不卡| 91丝袜| 临朐县| 老湿机69| 国产亚洲国产精品二区| 亚洲自偷精品视频自拍| 最新91地址永久入口发布| 久久久久久国产精品无码超碰动画| 国产精品一区二区AV不卡| 国产开裆丝袜高跟在线观看| 亚洲国产综合自在线另类| 久久午夜夜伦鲁鲁片免费无码| 国产精品一区在线蜜臀| 久久中文字幕人妻熟女| 国产无遮挡又黄又爽无VIP| 亚洲国产成人久久综合电影| 91福利国产成人精品导航| 国产乱XXXXX97国语对白| 破初无码中字免费观看| 亚洲成AV人的天堂在线观看| 精品一区二区三区在线观看视频| 无码高潮喷水在线观看| 国外欧美一区另类中文字幕| 视频一区视频二区亚洲免费观看| 亚洲大尺码专区影院| 狠狠噜天天噜日日噜无码| 欧美日韩国产高清| 亚洲国产精品综合久久2007| 亚洲综合视频在线观看| 熟年中出交尾六十路七十路| 91色老久久精品偷偷蜜臀| 尤物在线观看视频免费| 成年大片免费视频播放二级| 精品国产电影在线看免费观看| 久久91精品国产91久久麻豆|