<sup id="eeeee"></sup>
  • <nav id="eeeee"><sup id="eeeee"></sup></nav>
    
    
    <tr id="eeeee"><blockquote id="eeeee"></blockquote></tr>
  • <noscript id="eeeee"><dd id="eeeee"></dd></noscript>
    <tr id="eeeee"><blockquote id="eeeee"></blockquote></tr>
  • <tfoot id="eeeee"><noscript id="eeeee"></noscript></tfoot>
    无码AV免费毛片一区二区,www.色网,99久久精品国产精品亚洲,狠狠色丁香婷婷久久综合2021,免费人成在线观看VR网站,一区二区视频午夜福利,五月天乱伦小说,999久久精品国产

    How to use electric sintering furnace correctly?

    2021-11-29 1721

      1: Check whether the circuit and water circuit of sintering furnace are normal, such as normal power on and water supply.

      2: Open the mechanical pump, slowly open the pre pumping valve after 30 seconds, and open the front stage valve after 1 minute.

      3: When the vacuum degree reaches below 10Pa, turn over the lax pump and heat the lax pump

      4: After the lax pump is heated to 60 minutes, close the pre pumping valve and open the high vacuum valve, and the vacuum will gradually reach the high vacuum.

      5: For heating initiation, please select Manual heating below 200 degrees. In the manual operation menu of the control panel, pay attention to that when you use it once, the dial button is not firm up and down once, and then dial it to the manual position to initiate heating. Enter about 50. Automatic heating when the current is normally controlled below 300A: set the temperature control meter in the temperature control interface to automatically start heating or open the manual position to start heating manually. The above setting clarifies that it takes 120 minutes from 200 degrees to 600 degrees, 30 minutes from 600 degrees, 130 minutes from 600 degrees to 1000 degrees, 5 hours at 1000 degrees, 60 minutes from 1000 degrees to 600 degrees, and the program will continue automatically after 60 minutes (Note: Set - 121 in time, and the program will continue automatically here). After setting the heating process, first heat continuously manually, then turn the dial button to the automatic position to initiate the automatic heating program. If the data needs to be recorded, please mark "√" at the data storage meeting.

      6: In the heat preservation state, the normal circulation of circulating water shall be adhered to.

      7: When the holding time is up, turn off the heating switch. Assuming that high vacuum is not required, close the slack pump, open the pre pumping valve, close the high vacuum valve and start cooling. Caution: do not turn off the mechanical pump

      8: When the temperature drops to 200 ℃, turn off the mechanical pump (the lax pump reaches the normal temperature) and close all valves.

      9: Release the pressure at room temperature, rush in the air and take out the raw materials.

      10: If the operation is not continued, open the mechanical pump and pre pumping valve, vacuum for another 5 minutes, and close the mechanical pump and pre pumping valve. Adhere to the vacuum degree in the operation room to avoid water vapor intrusion.

      11. Pressure operation: first, in the manual operation interface, the pressure reporting form is set to the automatic position, which can be operated directly with the instrument. After setting the program, press the run key for 3 seconds, and press the stop key for 3 seconds.

      Article from:http://m.oavoav.cn

    主站蜘蛛池模板: 国产欧美亚洲精品第3页在线| 婷婷国产天堂久久综合五月| 亚洲国产成人精品青青草原导航| 亚洲中文字幕乱码一二三区| 亚洲AV无码AV男人的天堂不卡| 色播丁香| 日韩精品国产精品高清| 又色又爽又黄的在线视频免费看 | 亚洲国产成人资源在线| 国产精品亚洲а∨天堂2021| 亚洲国产精品无码一区二区三区| 亚洲一区二区三区av激情| 欧美A级V片高潮喷水| 91操操操| 国产午夜在线观看视频| 舞阳县| 成AV人片一区二区三区久久| 亚洲一区二区三区激情视频| 99久久国产成人免费网站| 97精品久久久久中文字幕| 午夜色无码大片在线观看免费| 国模大尺度啪啪| 色欲AV无码一区二区人妻| 国产三级在线精品区| 久久99精品国产区一| 亚洲精品成人福利网站| 色五月五月丁香亚洲综合网| 永久免费的AV在线电影网无码| 日本一本草久国产欧美日韩| 徐水县| 久久精品国产亚洲婷婷| 亚洲色播永久网址大全| 国产小呦泬泬99精品| 性做久久久久免费看| 我想看一级毛片免费的 | 超碰色导航| 西乌珠穆沁旗| 免费人成网站在线高清| 都市激情 在线 亚洲 国产| 欧美人与拘牲交大全视频| 桃花综合久久久久久久久久网|