<sup id="eeeee"></sup>
  • <nav id="eeeee"><sup id="eeeee"></sup></nav>
    
    
    <tr id="eeeee"><blockquote id="eeeee"></blockquote></tr>
  • <noscript id="eeeee"><dd id="eeeee"></dd></noscript>
    <tr id="eeeee"><blockquote id="eeeee"></blockquote></tr>
  • <tfoot id="eeeee"><noscript id="eeeee"></noscript></tfoot>
    无码AV免费毛片一区二区,www.色网,99久久精品国产精品亚洲,狠狠色丁香婷婷久久综合2021,免费人成在线观看VR网站,一区二区视频午夜福利,五月天乱伦小说,999久久精品国产

    How to use electric sintering furnace correctly?

    2021-11-29 1722

      1: Check whether the circuit and water circuit of sintering furnace are normal, such as normal power on and water supply.

      2: Open the mechanical pump, slowly open the pre pumping valve after 30 seconds, and open the front stage valve after 1 minute.

      3: When the vacuum degree reaches below 10Pa, turn over the lax pump and heat the lax pump

      4: After the lax pump is heated to 60 minutes, close the pre pumping valve and open the high vacuum valve, and the vacuum will gradually reach the high vacuum.

      5: For heating initiation, please select Manual heating below 200 degrees. In the manual operation menu of the control panel, pay attention to that when you use it once, the dial button is not firm up and down once, and then dial it to the manual position to initiate heating. Enter about 50. Automatic heating when the current is normally controlled below 300A: set the temperature control meter in the temperature control interface to automatically start heating or open the manual position to start heating manually. The above setting clarifies that it takes 120 minutes from 200 degrees to 600 degrees, 30 minutes from 600 degrees, 130 minutes from 600 degrees to 1000 degrees, 5 hours at 1000 degrees, 60 minutes from 1000 degrees to 600 degrees, and the program will continue automatically after 60 minutes (Note: Set - 121 in time, and the program will continue automatically here). After setting the heating process, first heat continuously manually, then turn the dial button to the automatic position to initiate the automatic heating program. If the data needs to be recorded, please mark "√" at the data storage meeting.

      6: In the heat preservation state, the normal circulation of circulating water shall be adhered to.

      7: When the holding time is up, turn off the heating switch. Assuming that high vacuum is not required, close the slack pump, open the pre pumping valve, close the high vacuum valve and start cooling. Caution: do not turn off the mechanical pump

      8: When the temperature drops to 200 ℃, turn off the mechanical pump (the lax pump reaches the normal temperature) and close all valves.

      9: Release the pressure at room temperature, rush in the air and take out the raw materials.

      10: If the operation is not continued, open the mechanical pump and pre pumping valve, vacuum for another 5 minutes, and close the mechanical pump and pre pumping valve. Adhere to the vacuum degree in the operation room to avoid water vapor intrusion.

      11. Pressure operation: first, in the manual operation interface, the pressure reporting form is set to the automatic position, which can be operated directly with the instrument. After setting the program, press the run key for 3 seconds, and press the stop key for 3 seconds.

      Article from:http://m.oavoav.cn

    主站蜘蛛池模板: 久久综合亚洲色一区二区三区 | 一级做a爰片久久毛片16| 无遮挡边摸边吃奶边做的视频刺激| 尤物视频国产极品在线| 欧美1区二区三区公司| 人妖网址| 亚洲一本之道高清乱码| 亚洲欧洲美色一区二区三区| 色综合久久无码中文字幕app| 亚洲欧美日韩中文字幕在线不卡 | 91成人啪国产啪永久地址| 亚洲成AV人片一区二区三区| 麻豆第一区MV免费观看网站| 久久精品一本到99热免费| 国产精品毛片内在线看| 亚洲爆乳无码精品aaa片蜜桃 | 最新69国产成人精品视频免费| 无码av无码一区二区| 中文字幕无码A片久久东京热| 亚洲V日韩V无码一区二区 | 一级片黄色性生活久久| 三级黄色网址| 国产91久久精品久久精品| 人妻AV无码专区久久| 亚洲AV永久无码一区二区三区| 久久超碰色中文字幕超清| AV激情亚洲男人的天堂| 久久综合一个色综合网| 国产偷国产偷高清精品| 精品人妻无码视频中文字幕一区二区三区| 亚洲中文字幕有码视频| 中文字幕第8页| 2021亚洲精品不卡a| 久久精品国产99久久6动漫| 亚洲AV涩涩涩成人网站在线播放| 久香草视频在线观看| 东安县| a亚洲欧美中文日韩v日本| 91福利国产在线在线播放| 精品国产VA久久久久久久冰| 中文字幕一区二区三区精品|